Award Letter Documentation

Import Files and File Details
Award Letter Import Files and File Detail When you first login to the application, you will arrive in the Import File page. This page is a summary of al...
Mon, 7 Aug, 2017 at 2:33 PM
Award Letter File Specifications (Vertical)
Award Letter File Specifications A vertical (or stacked) file is the newest, and most recommended, file format accepted by the AwardLetter applicatio...
Mon, 7 Aug, 2017 at 2:35 PM
Create/Identify Network Folders
This guide will walk you through creating folders which are required for several of our integration touch points. In order to utilize our Award Letter U...
Mon, 7 Aug, 2017 at 2:30 PM
AwardLetter Upload
The AwardLetter Upload step will allow you to configure settings in regards to the automated upload process. *Upload File Path: The file...
Thu, 7 Jun, 2018 at 8:12 AM
AwardLetter Print Batch Processing
This section will show you how to setup the Batch Processing integration in CL Connect. This integration will create a single, high-quality, PDF for eac...
Thu, 29 Mar, 2018 at 10:12 AM
AwardLetter Print
This guide will walk you through setting up CL Connect for the Award Letter Print integration  Allows configuration in regards to the process for AwardLet...
Fri, 16 Mar, 2018 at 8:38 AM
Banner Export Instructions
Banner
Wed, 7 Mar, 2018 at 2:27 PM
AwardLetter Upload Testing
Award Letter Testing Testing in sandbox is one of the critical last steps in the setup to go live. This final approval will push everything ...
Mon, 7 Aug, 2017 at 2:29 PM
AwardLetter Print Testing
This guide will walk you through testing out the Award Letter Print option in CL Connect. Step 1 - Before You Begin... Ensure you have completed al...
Wed, 16 Aug, 2017 at 7:12 AM